Which visualization will accomplish this?

2 Comments

  1. Willie
    Author

    I rank that the answer is:
    A scatter plot showing the correlation between maximum tree depth and the objective metric.

  2. Cynthia
    Author

    I draft that the answer is:
    A scatter plot showing the correlation between maximum tree depth and the objective metric.

Leave a Reply

Your email address will not be published. Required fields are marked *

seventeen − ten =